Capacity Q (M3/Hr) |
Head H (M) |
End Pressure P (Bar) |
Operation Temp. t ( oC) |
Up to 1000 | Up to 100 | 16 | Up to 140 |
Capacity Q (M3/Hr) |
Head H (M) |
End Pressure P (Bar) |
Operation Temp. t ( oC) |
Up to 90 | Up to 60 | 10 | -20 to +110 |
Capacity Q (M3/Hr) |
Head H (M) |
End Pressure P (Bar) |
Operation Temp. t ( oC) |
Up to 4000 | Up to 100 | 16 | Up to 140 |
Capacity Q (M3/Hr) |
Head H (M) |
End Pressure P (Bar) |
Operation Temp. t ( oC) |
Up to 600 | Up to 100 | 16 | Up to 140 |
Capacity Q (M3/Hr) |
Head H (M) |
Up to 60 | Up to 30 |
"SHAMS ENGINEERING" Provide (Fire Detection & Protection System; Pumping System(Industrial Pump & Deep tube well, Booster Pump etc.); Water Treatment Plant (WTP); Effluent Treatment Plant (ETP); Sewerage Treatment Plant (STP); "E.ENGINEERS TRADE" Provide (Retrofit Work; Details Engineering Assessment ( DEA); Construction ( RCC & Steel Structure )